Translate

About the blog

This rambling blog is about building a couple of simple layouts in HO, the available space is rather small but the prototype was not built on the grand scale, most stations were merely a curved loop and a siding.


Sunday, 7 May 2017

Treading the boards -

The new baseboards have received their coat of cork, now tracklaying and wiring can commence, the task  should be completed by next Thursday.


Heavy reading is needed to help the glue bond
Ta Da!
The surfaces were pre-misted with wet* water to help absorbtion of the PVA glue, it seems to be holding. 
*Water plus a few drops of Isopropynol Alcohol

No comments:

Post a Comment

Your comments are welcome but try not to be anonymous.